![]() |
|
|
|
tecumseh
throttle linkage,linkage,tecumseh 6 horsepower engines
|
||
|
Please
click the following links for pictures on how the throttle linkage should
sit on the back side of the engine on a ken bar go cart with a 6hp Tecumseh
engine. If you have any problems installing these component, any lawn
mower shop that services Tecumseh Engines can offer advice or help out
on installation procedures. After installation is complete, always put
the machines front end against a wall, tree, ect... on start up in case
the linkage is not installed properly and the cart idles too high(causing
it to take off by itself, if so hit the engine kill switch that is within
reach). First i usually put the fish hook looking part through the top
right hole, making sure the hook is facing the engine. Then i connect
the bottom right hand linkage over the tab that is there. This leaves
you with the spring loaded linkage part that runs back to the left of
the go cart engine. Stretch it out and hook it through the #2 setting
and clamp it securely by hand. Once more any lawn mower shop that services
Tecumseh engines can help you out with these procedures. You can get a
little quicker throttle pick up by bending the metal tab slightly to the
right that the fish hook looking part goes through with a plier. Be Carefull!
Installation is not that hard if the installer looks at the pictures provided
on this page. Start machine pointed at an unmovable object on start up.
LINKAGE PICTURE #1 LINKAGE PICTURE #2 LINKAGE PICTURE #3 LINKAGE PICTURE #4 LINKAGE PICTURE #5 ALWAYS BE SAFE |
||